Studio Vidha

One contract, design to handover

Turnkey Interior Contractors in Nagpur

You approve a drawing and a number. We manage the vendors, the sequence and the site, and hand you a finished space with the snag list already closed.

  • Single point of responsibility from design to keys
  • Full BOQ so you can see what every rupee buys
  • Vendor appointment, purchase tracking and delivery scheduling
  • Snagging closed before final payment
Scroll sideways

Tell us about your project

We reply within 1–2 working days. No call centre — you speak to the studio.

Why us

What turnkey should actually mean

Turnkey is a word that gets used loosely. Too often it means a lump-sum quote, a vague scope and a long argument about what was included.

For us it means a full bill of quantities you can read, named vendors, a written sequence, and one team answerable for all of it. If a material changes or a rate moves, you see it against the original line — not as a surprise at the end.

01

Design & drawings

The complete set — layouts, joinery, ceiling, electrical, plumbing — before costing begins.

02

BOQ & tendering

Line-by-line quantities, tendered to vetted contractors so quotes are comparable.

03

Execution & supervision

Civil, joinery, electrical, painting and finishing, sequenced and supervised.

04

Handover & snagging

A walk-through, a written snag list and every item closed before accounts settle.

In detail

What a turnkey BOQ should actually list

A proper bill of quantities breaks the work into items you can check: running feet of wardrobe, square feet of false ceiling, the number of electrical points, the area of tiling — each with a material specification and a rate.

It should also say what is not included — appliances, loose furniture, décor, soft furnishings — so a second budget does not appear at the end.

And it should state how changes are handled: priced against the original line and approved by you in writing before the work goes ahead. A turnkey quote that cannot show all three is a lump sum with a promise attached, not a contract.

How we work

How a turnkey contract runs

Step 01

Design sign-off

Every drawing approved before costing begins, so the price is for a defined scope.

Step 02

One contract

A single agreement covering design, materials, labour and supervision, with payment milestones.

Step 03

Managed execution

We buy, schedule and supervise; you get a weekly update instead of a dozen vendor calls.

Step 04

Keys & snag list

The final payment is released only once the written snag list is closed.

The studio

The studio in numbers

Projects delivered

120+

Clients worldwide

100+

Years of practice

10+

Design professionals

19

Questions

Frequently asked

Is turnkey more expensive than hiring separately?

Not usually. Because the scope is drawn and tendered properly, quotes are comparable and there is far less wastage from rework. What you avoid paying for is the cost of nobody owning the mistakes.

What happens if costs go up mid-project?

Any change is raised against the original BOQ line, priced, and approved by you in writing before it is executed. There are no verbal variations.

Who manages the vendors and material purchase?

We do. Purchase tracking, follow-up, delivery scheduling and quality checks on arrival are part of the scope.

What is the payment schedule?

Staged against progress milestones set out in the contract, with the final tranche released only after snagging is complete.

Call +91 93071 89776 01 / 08